Projects
List of key projects that we have completed.
ONGOING PROJECT: 23HH0043

Some Progress Work

PROJECTS: TREE PRUNING / TRIMMING

CR RENOVATION

Supply and Install of WTS Car Barrier System

Fabrication and Installation of CATLWAK at TOP of Rework Area as Access to Production and Warehouse Roof

Supply and Install of 2 Tons Cargo Lift

Class 100K Modular Clean Room Design, Supply and Install

Class 100K Modular Clean Room Design, Supply and Install 2

Project: Perimeter Wall Fencing 125 Mtrs x 2.8Mtrs

Crating, Vacuum Packing and Rigging of 18 Machines

DEMOLITION, CLEARING AND SCRAP RECOVERY

UNLOADING,UNCRATING and POSITIONING of 3 EQUIPMENT

Packing and Crating of 18 Machines for China

Fit-outs and Renovations

Demolition of Collapsed 3600 SQM Warehouse

Fisheye Camera System at Packing Area

Raw Material Recovery (after Typhoon Odette)

Conveyor System (Loader / Unloader)

Mobile Clean Room Conveyor

STP Earthworks / Design and Build for Soil Protection

Proposed Locker Extension

Supply and Installation of Hygiene Products

Orion Supply of CCTV ad PA Systems for 16-Storey

Vehicle Disinfection System

Summary of other Products and Services:

Other Capabilities

Summary List of Compeleted Projects


List of In-Progress Projects

OTHER KEY PROJECTS COMPLETED and CAPABILITIES

ONGOING PROJECTS and CAPABILITIES

